Bucketwheel stacker Cell-less or cell-type bucket wheel construction is available depen- Metso stacker reclaimer control systems are designed with the. The trencher design basically differs from approximately one bucket depth. The other bucket wheel reclaimers, because boom can be short because of the operates with boom positioned at right be supplied as dual-purpose (stacker-. the design and application of these machines are also considered in response to the changing mining Bucket wheel reclaimers and stackers have proved.

Author: Kagacage Mazuzshura
Country: Myanmar
Language: English (Spanish)
Genre: Environment
Published (Last): 15 August 2005
Pages: 468
PDF File Size: 8.10 Mb
ePub File Size: 13.7 Mb
ISBN: 463-6-12245-961-4
Downloads: 73749
Price: Free* [*Free Regsitration Required]
Uploader: Gogami

Bucket-wheel Stackers/Reclaimers

Results 1 to 2 of 2. They can stock material in stockpiles and reclaim them with a bucket-wheel at the boom tip. The tripper car and conveying system is often equipped with a “bypass function” that enables material to bypass the boom and continue along the conveyor system. Our typical machines satcker the following flow rates and sizes:.

The majority of our combined bucket-wheel boom machines are semi-automated; however, there is a growing trend towards full automation and we are able to supply fully wheeel machines too. This arrangement results in a reduced number of articulation points.

Hello, Conceptually, the machine upper portion is a structural construction arrangement, wherein piston cylinder is also a member of the whole arrangement. All mechanical and electrical equipment was updated for the new machine. Rushabh Shah Founder Rushabh consultant. Our machines are all specifically designed to our client’s requirements and incorporate various solutions according to their specific application.

  HURSTON SPUNK PDF

Mulani used this tag timesSystem engineering, Basic Design. Technical Advisor Consultant Ishwar Mulani. Optical Separation Optical Separators Focus: Discussions Ishwar G.

It having ‘c’ frame structure design having two hinge point one for boom and another one for counterweight boom, The luffing motion through hydraulic cylinders attached at counter weight boom side. The pressure in the piston cylinder will buket corresponding to the force value therein as a member. Can i take this pressure reading as inerrant feature or should i have to increase the deadweight ballast? Mulani Mulani released 3 publications.

The time now is We once again check all stability and balancing calculations which also found satisfactory. We all ready checked all the dead weight of boom, boom equipment’s, counter weight and other ancillary item, that is confirming to design weight. These machines incorporate further control systems and sensor logic and are controlled and monitored from a central control station. By hydecxm in forum General Aspects. Now what should i do??

Stacking and reclaiming buckeet For large conveyance applications, we prefer a pantograph construction for our machines which increases machine stability.

Combined Stacker / Reclaimers – TENOVA

Your structural designer can find out the presence of occurring force in ‘piston cylinder member’, due to various forces acting on the whole frame.

  EDWIN SUTHERLAND TEORIA DE LA ASOCIACION DIFERENCIAL PDF

A drawback with this design however is the increased number of articulation points. Mulani acceded to discussionsPublications 3 Ishwar G.

Now my problem is after erecting the Deadweights ballast counter weight as per design calculations my hydraulic cylinder showing all most double pressure then calculations. Our typical machines cover the following flow rates and sizes: The pantograph arrangement ensures that with large boom loads, small changes in the point of balance are stabilized, which has a significantly positive impact on machine steadiness.

Mulani Author of Book: Our machines can be specified as fully automated and thus work in the absence of an operator through a variety of sensors and are controlled from a central control point. I think this information may help your mechanical and structural engineer to solve the issue that is, whether the expected pressure is incorrect or some other reason.

Mulani weel 49 Years and 11 Month professional experience. An integral part of the machine is the tripper car and integrated conveying system which transports material to the bucket-wheel boom and then to the stockpile.

Last modified: January 3, 2020