on nuclear power plants in EPRI NP, “Guidelines for Nuclear Plant Response to an Earthquake,” December This regulatory. These guidelines are in EPRI NP, “A Criterion for Determining Earthquake,” July ; EPRI NP, “Guidelines for Nuclear Plant. EPRI-NP Guidelines for Nuclear Plant Response To an Earthquake.

Author: Zulurr Danos
Country: Malawi
Language: English (Spanish)
Genre: Automotive
Published (Last): 13 February 2014
Pages: 173
PDF File Size: 2.20 Mb
ePub File Size: 10.42 Mb
ISBN: 269-3-87062-749-5
Downloads: 2688
Price: Free* [*Free Regsitration Required]
Uploader: Nejas

There was a problem providing the content you requested

The inspections found that the equipment was in satisfactory condition. None of the aftershocks resulted in any impact to plant structures, systems, or components.

The plant exited the NOUE on the afternoon of August 24 after completing all walkdown npp of the equipment that is most susceptible to seismic activity. Amplifying information concerning the NRC actions in response to the August 23, earthquake in Virginia is available in the NRC’s website at the following link: The CAL confirmed the understanding that the plant operator was not to enter Modes 1 through 4 until the NRC has eri its safety evaluation and reported its conclusion to the plant operator in writing.

The NRC technical evaluation of restart readiness can be viewed at the following links: Here you only see the latest event report ERF send date: The map shows a maximum of incidents. Thu, ERF description: A backup, “station blackout” diesel generator was started to assume the loads that were being supplied by the 2H EDG.

  JOHN SCOFIELD CISSY STRUT PDF

Therefore, on August 26, the operator declared all safety-related SSCs of Units 669 and 2 inoperable for technical specifications purposes. Drag or zoom the map to explore different areas.

EPRI-NP | Guidelines for Nuclear Plant Response To an Earthquake | Document Center, Inc.

On August 29, the NRC dispatched an Augmented Inspection Team AIT to the North Anna Power Station to assess the circumstances surrounding the total loss of offsite power and dual unit reactor trip, the emergency diesel generator coolant leak and other plant equipment issues.

On August 23,an earthquake measuring 5. Cynthia Jones ERF address: To demonstrate that no e;ri damage occurred as a result of the earthquake and that it was safe to operate the facility without undue risk to the health and safety of the public, the North Anna Power Station operator performed a number of inspections, tests, and analyses, consistent with EPRI NP, “Guidelines for Nuclear Plant Response to an Earthquake.

Last update on 01 Dec ERF affiliation: Cook and Palisades in Michigan. Sometimes there are multiple event reports, updating the rating, the event description.

Trial application of guidelines for nuclear plant response to..|INIS

Contact us if a location is wrong. All of these plants exited their NOUE declarations after completing inspections and receiving confirmation of normal conditions. Here you only see the latest event report. Units 1 and 2 entered cold shutdown conditions on August 24, and August 25,respectively.

  LIBRO ARMAS SILENCIOSAS PARA GUERRAS TRANQUILAS NOAM CHOMSKY PDF

To demonstrate that no functional damage occurred as a result of the earthquake and that it was safe to operate the facility without undue risk to the health and safety of the public, the North Anna Power Station operator performed a number of inspections, tests, and analyses under the oversight of the United States Nuclear Regulatory Commission.

epru Following the earthquake, both North Anna units experienced a complete loss of offsite alternating current AC power LOOP sources to emergency electrical buses due to the actuation of transformer eori relays from the effects of seismic action.

Due to additional seismic activity, North Anna declared an NOUE on two other occasions with the final one being declared on September 1, If hundred incidents or more are within the map, the yellow perimeter indicates from where events are excluded.

Last modified: December 30, 2019